0 Comments

The lithium phosphate deep cycle battery I’m hoping will run my Christmas lights the duration of the parade.

Wednesday, Nov. 18, 2026

Work continued in the shop today on my 55 Chevy wagon as I get it ready for the upcoming Christmas Parade.

Today I received my box of C9-sized LED bulbs, and I used those to replace all of the incandescent C9 bulbs in the wreath I’ll place in the middle of the Chevy’s grill. The incandescent bulbs are 7 watts power consumption, while the LED versions are 0.6 of a watt consumption. I replaced them and then plugged the lights in. They’re almost obnoxiously bright, which is perfect for a wreath on the nose of the wagon!

The Christmas tree is assembled and outfitted with a string of C9-sized LED lights. I have one more string of lights to go, and those will be wrapped around the platform of presents on top of the car.

Today I wrapped up a few extra smaller packages for the platform. We have one large box as the center piece box, then we’ll have a bunch of smaller boxes that I will hot glue to the platform as the other boxes. Last year I cut the wrapping paper off the boxes to make sure the hot glue stuck cardboard surface to cardboard surface, and boy howdy, did those boxes stay solid!

This charger will handle charging chores so I can put the battery setup through its paces in the days before the parade.

I found all of the bungee cords we used last year, including the adjustable bungies, which were a godsend. I’ll used those to hold dthe platform down to the roof,, and then use the regular bungee cords to help secure the packages to the platform. I will use the bungee cords to support the lights too, I expect.

My LED display sign will be mounted to the front end of the plywood platform. At this point, I need to order a 12.8 100 aH lithium battery and a suitable charger. I plan to give the lights a full test, and have them run at least 2 hours. I don’t expect to need that much time, but if it is necessary, I want to be certain we’ll have that much reserve power.

While the LED sign uses LEDs, I’m not sure how much power it actually draws. That’ll be part of my testing on the power draw the lights need.

ORDER UPDATE. I’ve ordered a 12.8 100 aH lithium phosphate battery and an appropriate charger. The battery will be here next week; the charger arrives in a couple of days. I’ll have the wreath installed, the tree in the back and pallet of presents on top of the car by this weekend. Once the battery arrive I’ll have a chance to stress test the lights. Here’s hoping I get some decent light times from the setup!

Now the inverters I have are all modified sine wave units; they’re supposed to work fine for lights. If I need a pure sine wave inverter, I’ll have to find one I suppose. My thinking is that the LED lights will have such little draw that they won’t be a super heavy draw on the deep cycle battery. The lithium phosphate battery chemistry is supposed to allow up to 80 percent of the battery power to be drawn and still maintain 12.8 volts. If anything becomes an issue, I think the LED signage might be an issue; if so, my plan is to nix the sign and just go with the lights. That’s the deal for now anyway.

CHATGPT created a nice graphic of my wagon outfitted for Christmas. I wrote a prompt and it came up with a very nice version of the wagon, with wreath on the front, presents on top and tree in the back.

To quote the man with the bag, “Ho! Ho! Ho!”

Leave a Reply

Your email address will not be published. Required fields are marked *